Roughly eight to ten weeks from your last confirmed item to a finished room — here is exactly where that time goes.

Total lead time is 8 to 10 weeks from the last confirmed item. Here is how those weeks are spent.
Start a ProjectYou send the room measurements and your wishes. We work out what is possible.
A 3D concept sets the layout, dimensions, sink and appliances. Allow 10 working days.
5 weeks from your final confirmation, in our own factory.
You are welcome to inspect the finished furniture at the factory before the balance is paid.
Final control, packing and transport booking take up to 10 working days.
A few points from our standard offer terms that are worth knowing before you order.
Ask a QuestionOur quotation holds for 7 days from the date it is issued.
Paying the 50% advance accepts the offer. No signature is required.
Every detail is agreed in writing. If we build against a written note, we correct it at our cost.
Take the 2D and 3D drawings seriously — once approved, they are what gets built.
Public and religious holidays and our collective annual leave shift the delivery date.